a little behind schedule......
#1
Le Mans Master
Thread Starter
a little behind schedule......
....but getting there. This ORI is killing my personal life, but somehow I don't think ACC IG really cares
1st off, the car no longer drips coolant thanks to new water pump gaskets, new T-stat and silicon hoses from LG and it shouldn't be burning oil thanks to the catch-can from CCA
Next up, I've got a set of T-1 sways, LG coil-overs, poly-bushings from Pfadt, new wheel bearings from Auto Zone, and a new-to-me accusump waiting to be installed. Just got to get my camber/stud kit which is probably waiting on me at home and new tie-rod ends and ARP wheel studs and it'll be ready to go.
Next up: Radiator/oil cooler & Trans/diff coolers
Then: Heads/cam/headers and all the power goodies
-----------------
why in the world is there a Hyundai ad on the corvette forum...in the AutoX/RR section to make it even worse???
1st off, the car no longer drips coolant thanks to new water pump gaskets, new T-stat and silicon hoses from LG and it shouldn't be burning oil thanks to the catch-can from CCA
Next up, I've got a set of T-1 sways, LG coil-overs, poly-bushings from Pfadt, new wheel bearings from Auto Zone, and a new-to-me accusump waiting to be installed. Just got to get my camber/stud kit which is probably waiting on me at home and new tie-rod ends and ARP wheel studs and it'll be ready to go.
Next up: Radiator/oil cooler & Trans/diff coolers
Then: Heads/cam/headers and all the power goodies
-----------------
why in the world is there a Hyundai ad on the corvette forum...in the AutoX/RR section to make it even worse???