My continued restoration, condensed version, mostly pics.
#1
Drifting
Thread Starter
My continued restoration, condensed version, mostly pics.
Ok, heres a condensed version of my restoration on my 77. I took out a lot of the old comments and texts. Was getting a bit long. But the restoration continues......
In the beginning...
In the beginning...
Last edited by dmeesq; 02-05-2011 at 10:23 PM.
#10
Drifting
Thread Starter
Sidepipes go on...
Heat shields go on
Link to sidepipe install... http://forums.corvetteforum.com/c3-g...tall-pics.html
Link to sidepipe video... http://www.ezlinks.org/vette/vette.swf
Heat shields go on
Link to sidepipe install... http://forums.corvetteforum.com/c3-g...tall-pics.html
Link to sidepipe video... http://www.ezlinks.org/vette/vette.swf
Last edited by dmeesq; 02-28-2010 at 10:21 PM.
#16
Drifting
Thread Starter
Ok now its time to actually work on perfomance and not just looks, new engine, TKO 500 5 speed trans, and stainless headers and sidepipes...
Bored 30 over, flat top hypereutectic 10:1 pistons, Edelbrock RPM heads, matching cam, scorpion roller rockers, ARP bolts, 7qt. oil pan, Edelbrock 800cfm carb, RPM hi flow fuel pump, Performer EPS intake, upgraded 8" balancer, ect. ect. ect. Hopeing for 410 to 430hp.
Custom air cleaner going back on when engine is in car, engine, trans, and new side pipes should be on by 2nd week of march.
MORE TO COME......
Bored 30 over, flat top hypereutectic 10:1 pistons, Edelbrock RPM heads, matching cam, scorpion roller rockers, ARP bolts, 7qt. oil pan, Edelbrock 800cfm carb, RPM hi flow fuel pump, Performer EPS intake, upgraded 8" balancer, ect. ect. ect. Hopeing for 410 to 430hp.
Custom air cleaner going back on when engine is in car, engine, trans, and new side pipes should be on by 2nd week of march.
MORE TO COME......
Last edited by dmeesq; 02-28-2010 at 10:33 PM.