TPW date to build date?
#1
Instructor
Thread Starter
Member Since: Apr 2014
Location: Lake Worth FL
Posts: 186
Likes: 0
Received 0 Likes
on
0 Posts
TPW date to build date?
I had posted a different post regarding delivery date and courtesy delivery but just modifying a bit. I received a TPW date of 8/18 (moved up a week). What can be the expected approx build date range?
Thanks
Thanks
#3
Team Owner
Any time for 8-18 to 8-23.
#4
Instructor
Thread Starter
Member Since: Apr 2014
Location: Lake Worth FL
Posts: 186
Likes: 0
Received 0 Likes
on
0 Posts
#6
Instructor
Thread Starter
Member Since: Apr 2014
Location: Lake Worth FL
Posts: 186
Likes: 0
Received 0 Likes
on
0 Posts
#8
Team Owner
I'm in the same boat.. 8-11 tpw and hoping to take the new one to the Corvette Caravan at the end of August.
#10
Race Director
My car was in the first batch of convertibles off the line. They were on a quality control hold for a minute. I picked her up at the museum on 12/11/13.
#11
Chevrolet normally holds the first few weeks of initial model year production for quality checks and as the weeks of production goes by will randomly hold for quality checks. Toward the end of the model year many few random quality holds occur.
So the random checks start out at 100% and gradually go down to say 20% or fewer.
Laborsmith
So the random checks start out at 100% and gradually go down to say 20% or fewer.
Laborsmith
#12
Drifting
Our TPW was 5/8, and the car was born on 5/9. As stated, could be any time during that week. In the middle of the MY, it could even be built prior to TPW as it is just an estimate.