TPW 2/9 How Many Waiting
#28
Advanced
Member Since: Nov 2014
Location: Lincoln Nebraska
Posts: 50
Likes: 0
Received 0 Likes
on
0 Posts
I checked today and still at 3400. Getting anxious though.
Its going to drive me more nuts, waiting to pick it up between knowing it's built and taking delivery at the museum.
Its going to drive me more nuts, waiting to pick it up between knowing it's built and taking delivery at the museum.
#30
Instructor
Member Since: Dec 2014
Location: Ladera Ranch California
Posts: 123
Likes: 0
Received 3 Likes
on
2 Posts
I need meds for this! Once produced I have to wait til it's bayed then on the rail all the way to SoCal then to Callaway for 2 weeks then to my other shop for Suntek, window tint, Z06 grille and smoked out tails/reflectors...I want to bring this baby home 100% done!
#32
Instructor
Ordered on Jan 20 from MacMulkin. I originally had a TPW of 2/16. I opted for the buyers tour and the received notice that my build date is 2/12. That date was reaffirmed yesterday so looks like they are slightly ahead of schedule.
#33
C7
We were on the TPW of 2-9-15. Found out this morning that our car is at 4B00 Bayed - it was BUILT 2-6-15! Yesterday in the morning it was listed as 3400 and jumped right to 4B00 this morning.
1-21-15 3000
1-24-15 3300
1-29-15 3400
2-6-15 4B00
Now just waiting for the truck and good weather!
2015 Z51 Triple Black Convertible 2LT NNP Chrome wheels replacing our 2014 Z51 Vert
Happy Trails!
1-21-15 3000
1-24-15 3300
1-29-15 3400
2-6-15 4B00
Now just waiting for the truck and good weather!
2015 Z51 Triple Black Convertible 2LT NNP Chrome wheels replacing our 2014 Z51 Vert
Happy Trails!
#35