C4 ZR-1 Discussion General ZR-1 Corvette Discussion, LT5 Corvette Technical Info, Performance Upgrades, Suspension Setup for Street or Track

Build date

Thread Tools
 
Search this Thread
 
Old 12-06-2007, 08:51 PM
  #1  
key_on
Instructor
Thread Starter
 
key_on's Avatar
 
Member Since: Dec 2003
Location: Las Vegas,NV
Posts: 159
Likes: 0
Received 3 Likes on 2 Posts

Default Build date

Is there any way, other than having the build, sheet to determine the build date of my car? If so, how? It is a 91 #166.
Old 12-06-2007, 08:57 PM
  #2  
zr1fred
Race Director

 
zr1fred's Avatar
 
Member Since: May 2006
Location: Phoenix Arizona
Posts: 10,691
Received 71 Likes on 60 Posts

Default

On the drivers door there is a federal sticker. What passes as the build date is on the top.
Old 12-06-2007, 09:54 PM
  #3  
phrogs
Race Director

 
phrogs's Avatar
 
Member Since: Aug 2000
Location: kalamazoo
Posts: 12,047
Received 34 Likes on 22 Posts

Default

That date on the door is the month and year but not the actual date.

The date should be on the build sheet at least the julian date that the build sheet was printed thats the day that the build started or was put into production.

I think that may be completely wrong but Im pretty sure that the julian date is on the build sheet.
and you can buy that from the museum
Old 12-06-2007, 10:14 PM
  #4  
ZR-71
Team Owner
 
ZR-71's Avatar
 
Member Since: Mar 2001
Location: Santa Cruz CA
Posts: 56,084
Received 84 Likes on 58 Posts
St. Jude Donor '15

Default

I checked my build sheet and it says 91/165 which if I'm counting correctly says it was built June 14, 1991. The door sticker says 07/91. Does it take over 2 weeks to build?

Last edited by ZR-71; 12-06-2007 at 10:17 PM.
Old 12-07-2007, 01:00 AM
  #5  
WVZR-1
Team Owner

 
WVZR-1's Avatar
 
Member Since: Sep 2003
Posts: 23,069
Received 2,258 Likes on 2,021 Posts

Default Julian date

JP is correct I believe.

Maybe/likely the Julian date is used for scheduling and puts components in the correct order for build. The build date is completion on the build line and assignment of "certificate of origin"!. I don't have the build sheet for mine and I've never looked at one closely. Something I need to get done I expect!

Get notified of new replies

To Build date




Quick Reply: Build date



All times are GMT -4. The time now is 03:03 AM.