Corvette Production Weekly Constraints – 05/12/05
#1
Le Mans Master
Thread Starter
Member Since: May 1999
Location: Laurel MT
Posts: 6,841
Likes: 0
Received 44 Likes
on
23 Posts
Cruise-in I Veteran
Cruise-in II Veteran
Cruise-In III Veteran
Corvette Production Weekly Constraints – 05/12/05
This information will also be included in my weekly newsletter under the topic, Kens Newsletters.
Weekly Constraint/Production News - UPDATED
Constraints are distributed based on Available Days’ Supply (ADS), Controlled Method or Percent of Allocation (POA). Dealers can use the weekly constraint wire to see the basic availability of an option. The percentages on the weekly constraint wire are estimated based on the national retail number of the constrained option divided by the amount of retail orders being allocated for the week.
Chevrolet Constraint Wire for 05/12/05
2005 CORVETTE
Corvette constraints for May 12, 2005
Constraint Code, Description, Available Nationally
00479, Corvette Convertible, 294 (DOWN 7 from last week)
00649, Corvette Coupe/Convertible with Z51, 311 (UP 10 from last week)
Note that the Z51 package is expected to REMAIN ON CONSTRAINT for the remainder of the model year with production thru the first week of September.
Orders selected this week for dealers with allocation within constraints will be produced the week of 6/6/05 thru 6/12/05.
Weekly Constraint/Production News - UPDATED
Constraints are distributed based on Available Days’ Supply (ADS), Controlled Method or Percent of Allocation (POA). Dealers can use the weekly constraint wire to see the basic availability of an option. The percentages on the weekly constraint wire are estimated based on the national retail number of the constrained option divided by the amount of retail orders being allocated for the week.
Chevrolet Constraint Wire for 05/12/05
2005 CORVETTE
Corvette constraints for May 12, 2005
Constraint Code, Description, Available Nationally
00479, Corvette Convertible, 294 (DOWN 7 from last week)
00649, Corvette Coupe/Convertible with Z51, 311 (UP 10 from last week)
Note that the Z51 package is expected to REMAIN ON CONSTRAINT for the remainder of the model year with production thru the first week of September.
Orders selected this week for dealers with allocation within constraints will be produced the week of 6/6/05 thru 6/12/05.