C7 General Discussion General C7 Corvette Discussion not covered in Tech
Sponsored by:
Sponsored by:

Constraints - January 15 for TPW of February 9/23

Thread Tools
 
Search this Thread
 
Old 01-16-2015, 12:21 PM
  #1  
Zymurgy
Moderator

Support Corvetteforum!
Thread Starter
 
Zymurgy's Avatar
 
Member Since: Feb 2006
Location: DFW Area TX
Posts: 35,608
Received 15,072 Likes on 6,171 Posts

Default Constraints - January 15 for TPW of February 9/23

RPO............Description.............. ..................Availability
Z51............Performance Package............................50%
C2Q............Dual Roof Package (Body Color and Transparent)..0%
C2Z............Visible Carbon Fiber Roof......................20%
C2M............Dual Roof Package (Visible CF and Transparent).20%
CFA............Standard roof (painted)........................40%
Z07............Z06 Performance package........................45%
CFZ - Z07......Carbon Fiber Ground Effects minus Z07 Perf Pkg.25%
CFV............Carbon Fiber Ground Effects....................15%
M5U............8 Speed Auto Transimssion......................Not constrained this week


Target Production Week of February 9, 2015 for non-Z06.
Target Production Week of February 23, 2015 for Z06.
Old 01-17-2015, 08:39 AM
  #2  
11B250
Melting Slicks
 
11B250's Avatar
 
Member Since: Nov 2013
Location: Palm Beach County FL
Posts: 2,048
Likes: 0
Received 27 Likes on 19 Posts
Default

So with a TPW of 2/9, When will the car be shipped out etc?

I'm assuming, we're looking at end of February?
Old 01-17-2015, 07:15 PM
  #3  
Zymurgy
Moderator

Support Corvetteforum!
Thread Starter
 
Zymurgy's Avatar
 
Member Since: Feb 2006
Location: DFW Area TX
Posts: 35,608
Received 15,072 Likes on 6,171 Posts

Default

Originally Posted by 11B250
So with a TPW of 2/9, When will the car be shipped out etc?

I'm assuming, we're looking at end of February?
TPW of 2/9, so car could be finished 2/9 to 2/13 (or possibly a little earlier or a little later). If going someplace shipped by truck, it could leave BG within a day or two or up to 14 days later. A few more days for truck delivery to dealer, or as much as 4+ weeks for rail delivery.
Old 01-17-2015, 10:45 PM
  #4  
OVERULD
Burning Brakes
Support Corvetteforum!
 
OVERULD's Avatar
 
Member Since: Jul 2008
Location: Suwanee GA
Posts: 1,177
Received 296 Likes on 214 Posts
St. Jude Donor '16

Default

Originally Posted by Zymurgy
TPW of 2/9, so car could be finished 2/9 to 2/13 (or possibly a little earlier or a little later). If going someplace shipped by truck, it could leave BG within a day or two or up to 14 days later. A few more days for truck delivery to dealer, or as much as 4+ weeks for rail delivery.
I'm in that same TPW but doing the R8C. Any idea how long from production until the car arrives next door at the Museum?

BJ
Old 01-17-2015, 10:49 PM
  #5  
Zymurgy
Moderator

Support Corvetteforum!
Thread Starter
 
Zymurgy's Avatar
 
Member Since: Feb 2006
Location: DFW Area TX
Posts: 35,608
Received 15,072 Likes on 6,171 Posts

Default

Originally Posted by OVERULD
I'm in that same TPW but doing the R8C. Any idea how long from production until the car arrives next door at the Museum?

BJ

The NCM will call you to schedule your delivery. The earliest date will be 2 weeks after the build date (the day the car rolls off the line).
Old 01-19-2015, 11:25 PM
  #6  
11B250
Melting Slicks
 
11B250's Avatar
 
Member Since: Nov 2013
Location: Palm Beach County FL
Posts: 2,048
Likes: 0
Received 27 Likes on 19 Posts
Default

Originally Posted by Zymurgy
TPW of 2/9, so car could be finished 2/9 to 2/13 (or possibly a little earlier or a little later). If going someplace shipped by truck, it could leave BG within a day or two or up to 14 days later. A few more days for truck delivery to dealer, or as much as 4+ weeks for rail delivery.
Its going to FL which is by truck... Let's just hope it doesn't take 14 days for it to get shipped lol...
Old 01-20-2015, 08:45 AM
  #7  
fdxpilot
Safety Car
 
fdxpilot's Avatar
 
Member Since: Jul 2001
Location: Ocean Springs MS
Posts: 4,661
Received 66 Likes on 48 Posts

Default

Originally Posted by 11B250
Its going to FL which is by truck... Let's just hope it doesn't take 14 days for it to get shipped lol...
Jackie Cooper Transportation has 10 days after the car is released for shipping to get it off the lot. They like to get a full load, 11 cars, all going to the same general geographical area. Sometimes, that takes a week or so. My '13 sat for 8 days until it shipped.
Old 01-20-2015, 05:21 PM
  #8  
11B250
Melting Slicks
 
11B250's Avatar
 
Member Since: Nov 2013
Location: Palm Beach County FL
Posts: 2,048
Likes: 0
Received 27 Likes on 19 Posts
Default

Originally Posted by fdxpilot
Jackie Cooper Transportation has 10 days after the car is released for shipping to get it off the lot. They like to get a full load, 11 cars, all going to the same general geographical area. Sometimes, that takes a week or so. My '13 sat for 8 days until it shipped.
That makes sense.

I can deal with the wait. It's not easy, but I know everyday I wake up, it's one day closer. Can't you get your onstar turned on before the car arrives as well, so you can track it?
Old 01-20-2015, 05:42 PM
  #9  
OnPoint
The Consigliere
Support Corvetteforum!
 
OnPoint's Avatar
 
Member Since: May 2006
Location: 2023 Z06 & 2010 ZR1
Posts: 22,247
Received 5,443 Likes on 2,270 Posts

Default

Boy, I would have figured the carbon fiber constraints would have cleared up by now, but obviously it hasn't.

Makes you wonder if the supplier will ever be able to get fully ramped up to demand.
Old 01-20-2015, 06:06 PM
  #10  
mtraylor2001
Racer
 
mtraylor2001's Avatar
 
Member Since: Oct 2006
Location: TX
Posts: 353
Received 31 Likes on 20 Posts

Default

Anyone with Status 3300 with TPW 2/9/2015? I"m in that week as well.

Get notified of new replies

To Constraints - January 15 for TPW of February 9/23




Quick Reply: Constraints - January 15 for TPW of February 9/23



All times are GMT -4. The time now is 11:50 AM.