Constraints - January 15 for TPW of February 9/23
#1
Moderator
Thread Starter
Constraints - January 15 for TPW of February 9/23
RPO............Description.............. ..................Availability
Z51............Performance Package............................50%
C2Q............Dual Roof Package (Body Color and Transparent)..0%
C2Z............Visible Carbon Fiber Roof......................20%
C2M............Dual Roof Package (Visible CF and Transparent).20%
CFA............Standard roof (painted)........................40%
Z07............Z06 Performance package........................45%
CFZ - Z07......Carbon Fiber Ground Effects minus Z07 Perf Pkg.25%
CFV............Carbon Fiber Ground Effects....................15%
M5U............8 Speed Auto Transimssion......................Not constrained this week
Target Production Week of February 9, 2015 for non-Z06.
Target Production Week of February 23, 2015 for Z06.
Z51............Performance Package............................50%
C2Q............Dual Roof Package (Body Color and Transparent)..0%
C2Z............Visible Carbon Fiber Roof......................20%
C2M............Dual Roof Package (Visible CF and Transparent).20%
CFA............Standard roof (painted)........................40%
Z07............Z06 Performance package........................45%
CFZ - Z07......Carbon Fiber Ground Effects minus Z07 Perf Pkg.25%
CFV............Carbon Fiber Ground Effects....................15%
M5U............8 Speed Auto Transimssion......................Not constrained this week
Target Production Week of February 9, 2015 for non-Z06.
Target Production Week of February 23, 2015 for Z06.
#3
Moderator
Thread Starter
TPW of 2/9, so car could be finished 2/9 to 2/13 (or possibly a little earlier or a little later). If going someplace shipped by truck, it could leave BG within a day or two or up to 14 days later. A few more days for truck delivery to dealer, or as much as 4+ weeks for rail delivery.
#4
Burning Brakes
Member Since: Jul 2008
Location: Suwanee GA
Posts: 1,177
Received 296 Likes
on
214 Posts
St. Jude Donor '16
TPW of 2/9, so car could be finished 2/9 to 2/13 (or possibly a little earlier or a little later). If going someplace shipped by truck, it could leave BG within a day or two or up to 14 days later. A few more days for truck delivery to dealer, or as much as 4+ weeks for rail delivery.
BJ
#5
Moderator
Thread Starter
#6
Melting Slicks
Member Since: Nov 2013
Location: Palm Beach County FL
Posts: 2,048
Likes: 0
Received 27 Likes
on
19 Posts
TPW of 2/9, so car could be finished 2/9 to 2/13 (or possibly a little earlier or a little later). If going someplace shipped by truck, it could leave BG within a day or two or up to 14 days later. A few more days for truck delivery to dealer, or as much as 4+ weeks for rail delivery.
#7
Safety Car
Jackie Cooper Transportation has 10 days after the car is released for shipping to get it off the lot. They like to get a full load, 11 cars, all going to the same general geographical area. Sometimes, that takes a week or so. My '13 sat for 8 days until it shipped.
#8
Melting Slicks
Member Since: Nov 2013
Location: Palm Beach County FL
Posts: 2,048
Likes: 0
Received 27 Likes
on
19 Posts
I can deal with the wait. It's not easy, but I know everyday I wake up, it's one day closer. Can't you get your onstar turned on before the car arrives as well, so you can track it?
#9
The Consigliere
Member Since: May 2006
Location: 2023 Z06 & 2010 ZR1
Posts: 22,247
Received 5,443 Likes
on
2,270 Posts
Boy, I would have figured the carbon fiber constraints would have cleared up by now, but obviously it hasn't.
Makes you wonder if the supplier will ever be able to get fully ramped up to demand.
Makes you wonder if the supplier will ever be able to get fully ramped up to demand.