2018 Factory orders...
#1
Racer
Thread Starter
2018 Factory orders...
When is or when was the cutoff for a 2018 factory order build before the plant shutdown?
I am placing an order tomorrow, 7/3.
Thanks
I think its gonna be a very long wait....
I am placing an order tomorrow, 7/3.
Thanks
I think its gonna be a very long wait....
#2
Race Director
It's too late. Anything ordered now won't be built until the plant opens up after the shutdown (opens in November I believe)
#3
Miller Time Wisconsin 🍺
Member Since: Oct 2012
Location: The only thing we have to beer is beer itself 🍺
Posts: 9,603
Received 1,440 Likes
on
940 Posts
2022 C7 of the Year Finalist - Modified
C7 of the Year - Modified Finalist 2021
Finalist 2020 C7 of the Year -- Modified
2018 C7 of Year Winner
2017 C7 of Year Finalist
St. Jude Donor '13-'14-'15-'16-'17-'18-'19-'20-'21-'22
You missed the cutoff. If you order tomorrow, it will be built when the start back up, supposedly in Nov. Yours will get the new paint.
#4
Race Director
#5
Burning Brakes
The cutoff was 6/20. Yea, you will have a bit of a wait. When the plant starts up again it will be producing only Red, White, Black, and I read possibly two other colors (not named). The remaining colors will be phased in over a six month period of time. i also read it will be operating at a lower capacity, producing less than the current amount of cars per day. You can always check the large forum dealers out there, they are getting some 18s in addition to the remaining 17s they have.
#6
Melting Slicks
Kerbeck has about 40 in stock and another 260 in transit before the plant shuts down.
#7
Safety Car
Member Since: Feb 2016
Location: Bainbridge Island WA
Posts: 4,980
Received 3,818 Likes
on
1,614 Posts
The cutoff was 6/20. Yea, you will have a bit of a wait. When the plant starts up again it will be producing only Red, White, Black, and I read possibly two other colors (not named). The remaining colors will be phased in over a six month period of time. i also read it will be operating at a lower capacity, producing less than the current amount of cars per day. You can always check the large forum dealers out there, they are getting some 18s in addition to the remaining 17s they have.
#9
Le Mans Master
Merry Christmas!! You'll probably be getting your car sometime in either November or December. I have a 2018 ZO6 on order and my TPW is 7/10, I'm not sure when the last TPW's before shutdown will be, but I think the plant shuts down either end of July or beginning of August. Maybe someone can correct me on that, but I don't think your car will make the deadline to be built before the shutdown. That was one of my concerns when I ordered, I want to get it before September so I can get the break-in oil change done and put a few miles on the car before I have to put it away for 5 months for the winter. Good luck on your order.
The following users liked this post:
Perf n Restore (07-03-2017)
#11
The cutoff was 6/20. Yea, you will have a bit of a wait. When the plant starts up again it will be producing only Red, White, Black, and I read possibly two other colors (not named). The remaining colors will be phased in over a six month period of time. i also read it will be operating at a lower capacity, producing less than the current amount of cars per day. You can always check the large forum dealers out there, they are getting some 18s in addition to the remaining 17s they have.
#12
Burning Brakes
Yes, it wasn't a big seller. It was on the 2018 "build and price" option on the Chevy website and someone said it was because you could get an early 18 in that color, but I don't know for sure. If so, as was already stated, the "early" 18 cutoff has come and gone.
Definately a possibility on both accounts.
That makes sense. I read that only 650 of the Carbon 65's will be built, and an estimated half of them will be made before the plant shutdown and the other half after the plant starts back up, but I'm guessing you already know all of that.
That makes sense. I read that only 650 of the Carbon 65's will be built, and an estimated half of them will be made before the plant shutdown and the other half after the plant starts back up, but I'm guessing you already know all of that.
Last edited by Steve Garrett; 07-02-2017 at 11:58 PM. Reason: Merged Posts-please use the Multi-Quote button (the middle icon) in the lower right hand corner of each post to make your responses look like this!