When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
I'm sitting at 3400 right now (for 8 days) and wondered if I'm past the point of worrying about being constrained on an option.
Specifically, I am non-z07 but ordered CFZ. I know that's sitting at 20%.
I was at 3400 for over two weeks I wouldnt worry about it one of these mornings you are going to get up and it will show built, they are eating thru the list at a pretty rapid pace now.
Any effect that supplier issues might have had were felt before you went to 3400, for example in the transition from 3300 to 3400. Your configuration has been locked in since you got to 3000.
Constraints only affect the 1100-2000 transition. The are on the order acceptance side. Once an order is accepted, it doesn't matter.
Oh no. It may not matter to acceptance but it certainly does matter to production. The availability of constrained parts will affect orders past the acceptance stage in that it could affect the actual production schedule. So a constraint can affect how long it takes to get to 3400, for example.
Designer Imagines A Corvette That Looks More Like a Corvette Than the Corvette
Slideshow: A Jaguar designer's personal project imagines what a modern front-engined Corvette might look like if Chevrolet revisited the golden age of the Stingray.