Just had Frame Sandblasted and...
I don't want to spray a light oil, as it would contaminate the weld area. I could prime the frame and mask all the areas I am going to weld, but that would be a mountain of work. How bad is it to leave the metal bare for 3 weeks? The garage is insulated and has a good vapor barrier. With the cooler weather, I would expect the air to remain relatively dry...
Also, how did people weld up their seams? Did you weld a small section on say the front of the frame, then switch to the back, then maybe to the middle of the frame. That way no one section gets too hot to warp?
Thanks in advance!
We did the sandblasting after welding, and only fully welded the seams between the chassis connections- nothing forward of the front (under-engine) crossmember, and nothing behind the differential mount. We did it in stages so we wouldn't warp the frame, though I really don't think that would be a concern.
I still need to weld a clutch cross-shaft mount but will grind the paint off when I do.
Weld through primer might be a bit on the expensive side, though. At least the stuff in spray cans is.
Actually, no matter what coating or paint, an acid etch will help.
Use Naval Jelly - or some other Phosphoric acid treatment.
It etches into the surface and converts a thin layer of the steel
(Iron) to iron-phosphate. This layer can protect the metal for
months. It will also wirebrush or sand off easily for clean welds.
The weld-through primer sounds OK - but it will contaminate
the weld. Also, coating with POR15 or similar products - you don't
want primer on the metal - you DO want a phosphoric etch, though.
You'll need the frame outside to wash it off after etching.
When welding the front area of the seams, I just paused between
sections of about 10 inches. This also allows the welder to
cool - staying within the duty cycle of the machine (usually
about 20% - of 10 minutes). Weld 2 minutes - cool for 8.





Weld through primer might be a bit on the expensive side, though. At least the stuff in spray cans is.
The Best of Corvette for Corvette Enthusiasts
I plan on getting all the welding done in the next 3-4 weeks, so hopefully the rust will stay to a minimum. I'll look into the phosphoric acid etch coatings in the meantime though.
As for the welding, it sounds like doing a short section of 4-8", then moving on to another area of the frame would be the best. Any more suggestions are of course appreciated.














