Tiger Shark progress report...
Phase One I did a long time ago...
Blackwing Air cleaner,
Bassani X-Pipe,
Borla Stingers,
Baer Eradispeed Rotors front and +1s rear
Phase Two is all about more power and upgraded suspension.
From front to rear...
LS6 Intake,
NGK TR 55 plugs and GM Hotwires,
Stainless Works Longtube Headers,
GM 3:42 Rear Diff.,
Protouque 2800 stall converter.
Also Z06 Shocks and sway bars then lowered it to stock bolt limits.
And just for fun a dual-gage pod on the "A" pillar to watch Vaccuum and EGT.
Phase Three is the Tiger Shark front and rear fascia. Also the "Hot and Cold" hood from Eckler's. I'm also installing the GT Foctory 'Diablo' vertical door hinges. Z06 rear brake ducts.
Thursday the car is actually being assembled and they tell me it should be back on the ground Friday evening. I can see the finish line now.

but what about the backup lights
i know the LED taillights look
but still you need backup lights.Ahmad
The Best of Corvette for Corvette Enthusiasts






but what about the backup lights
i know the LED taillights look
but still you need backup lights.Ahmad
they did my tigershark rear(classic) and ghl(xtreme) very pleased.



will be at the pavilions tomorrow eve and hopefully next sat too.


















