lots "o" work done this winter
, ECS told me to pick my car up on Wed. the 4th, still waiting for CCW 505a's and Hotchkis sways but here's a list of what they did so far....1) polished Novi sc
2) hardened output shaft
3) tex. clutch
4) minni tubbing for 19" 355's
5) Wilwood bbk
6) 3.73 rear, selling my 4.10's with 600 miles on them(stupid mistake with blower, at least for me)
7) ss Amer. Racing headers
8) hi-flow cats
9) Z06 Ti catback
10) lowered on stock bolts
11) C6 Z06 shifter
12) C6 Z06 shocks
I may be leaving something out I forget and I'm getting sick of all this typing
I'll definitely post pics when this project is all done....until then
oh yeah I'll be starting blingafication of the engine bay when I get it back....curse you corvette forum I have terrible mod fever now...J/K, this is great











