When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
I had a quick question. My 07 C6ZO6 shifter should be arriving tomorrow and I think it comes as a full assembly not just the shifter that bolts on with the four bolts. My question is what do you torque the bolts to that go into the torque tube? Do you need to torque them to any specific ft/lbs or do you just use lock tight and get them as tight as possible?
Here is a pic to show you guys what I'm talking about:
I referenced my Hurst install within it which gives you the torque specs.
Patches,
I needed the torque specs for the two torx bolts that go into the torque tube. In the hurst install it has the specs for the four bolts that directly go through the shifter base. Do you know what you tightened the two torx bolts to on the torque tube when you installed the full shifter assembly?