need a favor please
i would appreciate it.
Adam S.
1.) Install the S terminal washer, purple lead wire, and nut. (When installing the purple lead wire, orient it upwards to the 10:00 position.) Tighten S terminal nut to 35in lbs.
2.) Install the grey colored wire and the rust colored wire (both are from the engine wiring harness) and the positive battery cable terminal to the starter motor stud and install stud nut.(when installing the grey wire and the rust wire to the starter motor stud, orient them to the 6:00 and 7:00 position.) Tighten the stud nut to 89in lbs
Cheers
Last edited by PierEagle; Sep 6, 2007 at 04:21 AM.
1.) Install the S terminal washer, purple lead wire, and nut. (When installing the purple lead wire, orient it upwards to the 10:00 position.) Tighten S terminal nut to 35in lbs.
2.) Install the grey colored wire and the rust colored wire (both are from the engine wiring harness) and the positive battery cable terminal to the starter motor stud and install stud nut.(when installing the grey wire and the rust wire to the starter motor stud, orient them to the 6:00 and 7:00 position.) Tighten the stud nut to 89in lbs
Cheers


