C6 Corvette General Discussion General C6 Corvette Discussion not covered in Tech
Sponsored by:
Sponsored by: Feral Industries

Change order??

Thread Tools
 
Search this Thread
 
Old Aug 10, 2007 | 05:34 PM
  #1  
jdoelger's Avatar
jdoelger
Thread Starter
Instructor
20 Year Member
All Eyes On Me
Liked
Loved
 
Joined: Sep 2003
Posts: 168
Likes: 30
From: Medford Oregon
Default Change order??

Have an '08 on order. Event code 3100. Does anyone know when an order cannot be changed by the dealer? Thinking of adding F55 if possible.
Reply
Old Aug 10, 2007 | 05:36 PM
  #2  
corvetteconti @ EVS's Avatar
0corvetteconti @ EVS
Former Vendor
 
Joined: Mar 2007
Posts: 2,499
Likes: 1
From: EVS CHEVROLET -Wisconsin WI
Default

Originally Posted by jdoelger
Have an '08 on order. Event code 3100. Does anyone know when an order cannot be changed by the dealer? Thinking of adding F55 if possible.
to late...
You still will enjoy your car I'm sure!
Reply
Old Aug 10, 2007 | 05:42 PM
  #3  
Erix's Avatar
Erix
Pro
 
Joined: Aug 2007
Posts: 536
Likes: 0
Default

Rick,

What is the latest point in time you can submit changes to an order??
Reply
Old Aug 10, 2007 | 07:46 PM
  #4  
JSVet08's Avatar
JSVet08
Racer
 
Joined: Jul 2007
Posts: 323
Likes: 1
From: Fayetteville NC
Default

Originally Posted by karguy6
as long as the car doesn't go pass 3100 event code the dealer can call the bdc center and have voms support put the order back into the placed tab of the gm orderworkbench.at that point the dealer can make changes to the order, but the dealer can only order options that were not of constraint for that allocation week. sorry bro ...this is fact.
Found the above in a search. I thought no changes after 2500.....
Reply
Old Aug 11, 2007 | 06:14 PM
  #5  
Erix's Avatar
Erix
Pro
 
Joined: Aug 2007
Posts: 536
Likes: 0
Default

I was trying to figure out where it might be as the dealer indicated they could nix the chrome wheels so thought that might tell me how far out it is. They tought 5 - 6 weeks at the time.
Reply

Get notified of new replies

To Change order??





All times are GMT -4. The time now is 11:25 AM.

story-0
10 Reasons the C6 Z06 is Still A Performance Benchmark After 20 Years

Slideshow: 10 reasons why the C6 Z06 is still a performance benchmark after 20 years.

By Joe Kucinski | 2026-05-27 17:20:09


VIEW MORE
story-1
How Much Horsepower Every Corvette Engine "LOST" in 1972

Slideshow: How much horsepower every Corvette engine lost in 1972.

By Joe Kucinski | 2026-05-27 16:54:53


VIEW MORE
story-2
Top 10 DOs and DON'Ts for Protecting Your Convertible Top!

Slideshow: How to Protect A Convertible Top: 10 DOs & DON'Ts

By Michael S. Palmer | 2026-04-03 00:00:00


VIEW MORE
story-3
Top 10 Most Explosive Corvettes Ever Made: Power-to-Weight Ratio Ranked!

Slideshow: The 10 most explosive Corvettes ever built based on power-to-weight ratio.

By Joe Kucinski | 2026-05-20 07:23:03


VIEW MORE
story-4
150 hp to 1,250 hp: Every Corvette Generation Compared by the Specs That Matter

Slideshow: From C1 to C8 we compare every Corvette generation by the numbers.

By Joe Kucinski | 2026-05-12 16:54:12


VIEW MORE
story-5
8 Coolest Corvette Pace Cars (and Replicas) of All Time

Slideshow: Some Corvette pace cars became collectible legends, while others perfectly captured the look and attitude of their era.

By Verdad Gallardo | 2026-05-11 09:50:51


VIEW MORE
story-6
Top 10 Corvette Engines RANKED by Peak Torque (70+ Years of Muscle!)

Slideshow: Ranking the top 10 Corvette engines by torque output.

By Joe Kucinski | 2026-05-05 11:58:09


VIEW MORE
story-7
Corvette ZR1X Will Be Pacing the Indy 500, And Could Probably Race, Too!

Slideshow: A Corvette pace car nearly matching IndyCar speeds sounds exaggerated, until you look at the numbers.

By Verdad Gallardo | 2026-05-04 20:03:36


VIEW MORE
story-8
Top 10 Corvettes Coming to Mecum Indy 2026!

Among a rather large group of them.

By Brett Foote | 2026-05-04 13:56:44


VIEW MORE
story-9
Top 10 C9 Corvette MUST-HAVES to Fix These C8 Generation Flaws!

Slideshow: the top 10 things Corvette owners want in the C9 Corvette

By Michael S. Palmer | 2026-04-30 12:41:15


VIEW MORE