counting it down
March 30th (Sunday)
1 remove car cover
2 open garage dooor
3 let tire pressure down to 30 psi
4 disconnect CTEK charger
5 driive 1/2 mile to church parking
lot and do a bunch or figure 8's
for the rear diff.
6 drive around the bay until engine
is totally warm
7 Hit the freeway on ramp and enter
traffic at 70+mph
8 cruise up to Hood Canal Bridge
9 Lunch at Port Ludlow
10 cruise home
11 admire what I haven't seen in
5 months
Then: spend Spring & summer
driving: taking trips to the
ocean and Montana.
I can't wait but, there will still be
a lot of waxing and polishing in the
summer shade over a lot "Corona's".
Can't wait



