When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
I just went to Chevy.com owners/track orders and they indicated that my production control number was 3000 with a twp of 8/11/14. Exactly what do the control numbers mean. I see some guys have a 1000, 2000, 3000, 3100 and some looking for a 3400. I ordered my 2015, 2lt, velocity yellow coupe on June 13. Do you think that they will actually build my car the first week of production ?
Status codes and corresponding Chevy Order Tracker Status (as best as I have been able to determine):
Event Status Code 1000 Order On Hold at Dealership 1100 Order Placed at Dealership 1101 Order Entered into System 1102 Order Entered via Web 2000 Order Accepted By GM 2001 Order Generated to Dealer 2005 Order Replaced with Prospec Order 2030 Order Edited (If Necessary) 2050 Order Changed 2500 Order Preferenced (or "Picked Up" or "Imaged") 3000 Order Accepted by Production Control 3100 Order Available to be Sequenced 3300 Order Scheduled for Production 3400 Order Broadcast (Internal Plant Order Produced) 3800 Vehicle Produced 4000 Vehicle Available to Ship 4104 Bailment Invoice Created 4B00 Bayed 4D00 On Hold At Plant 4P00 Hand Off To Carrier 4106 Bailment Released 4150 Vehicle Invoiced 4200 Vehicle Shipped 4300 Intermediate Delivery 4V03 Estimated Delivery Date 4800 Rail Ramp Unload 5000 Vehicle at Dealer 6000 Vehicle Delivered to Customer 9000 Order Cancelled
Chevy Tracker Status Order Placed Queued for Production Production Complete Shipped/En Route At the Dealership
Once your order is assigned to an allocation by your dealer, you will very quickly move from 1100 to 3000.
I just went to Chevy.com owners/track orders and they indicated that my production control number was 3000 with a twp of 8/11/14. Exactly what do the control numbers mean. I see some guys have a 1000, 2000, 3000, 3100 and some looking for a 3400. I ordered my 2015, 2lt, velocity yellow coupe on June 13. Do you think that they will actually build my car the first week of production ?
How did you get an event code and TPW from the Chevrolet tracking site ? Did you get those from your dealer.
I just went to Chevy.com owners/track orders and they indicated that my production control number was 3000 with a twp of 8/11/14. Exactly what do the control numbers mean. I see some guys have a 1000, 2000, 3000, 3100 and some looking for a 3400. I ordered my 2015, 2lt, velocity yellow coupe on June 13. Do you think that they will actually build my car the first week of production ?
When I go to Chevy order tracking, it says Queued for Production, I don't see any of the codes listed. Does a number eventually show up on that page somewhere?
When I go to Chevy order tracking, it says Queued for Production, I don't see any of the codes listed. Does a number eventually show up on that page somewhere?
No, that site does not show codes. Best source of the status code on your order is your dealer.
Thanks for the list Rick. That clarifies everything. The way I got my numbers is ...... Chevy.comowners/trackorders and click on the live chat window that appears on the right and tell what you want and they will connect you to (I think it was customer service) and they will tell you your control number and the twp date.
No, that site does not show codes. Best source of the status code on your order is your dealer.
Or you can ask Chevrolet Customer Service order tracking thread on C7 General discussion Stickey, just give them your order number they will post what stage you are at.
Sticky Thread Go to first new post Sticky: Chevrolet Customer Service order tracking thread (Multi-page thread 1 2 3 ... Last Page)
talon90
There is too much inconsistency to say average time passed, but generally one goes to 3400 about a week or two after 3300, and again generally, 3400 usually appears about a week before build.