Nashville?



Since the line had started and vehicles were being produced, it didn't take long for the hold lot in Bowling Green to become full. A location had to be picked that was secure, in close proximity and designed to accommodate a large number of vehicles, a rail head in Nashville was selected and secured to transfer the hold lot cars out to be reviewed, inspected and worked on as necessary. Some of the earliest cars built spent up to 8 weeks in the hold lot (either at the plant or at Nashville) until the production was released.
Lots of drama for the new owners, lots of rumor, speculation and stories.
Everyone is getting awfully worked up about the start of the '15's. This is no different than the start of any other model year with the exception that it isn't happening during the plants annual shutdown over the first two weeks of July. The first Corvettes produced during any model year launch are held while the validation process happens (captured test fleet vehicles are built ahead of production and driven during the hold period. This is designed to shake out any production or part issues prior to sending the cars to their new owners. Nothing for people to be alarmed about. This is not Nashville. This is good (and routine) automotive manufacturing practice to attempt to put the very best foot forward and produce an automobile of the quality that the new owner expects.
Since the line had started and vehicles were being produced, it didn't take long for the hold lot in Bowling Green to become full. A location had to be picked that was secure, in close proximity and designed to accommodate a large number of vehicles, a rail head in Nashville was selected and secured to transfer the hold lot cars out to be reviewed, inspected and worked on as necessary. Some of the earliest cars built spent up to 8 weeks in the hold lot (either at the plant or at Nashville) until the production was released.
Lots of drama for the new owners, lots of rumor, speculation and stories.
.
Since the line had started and vehicles were being produced, it didn't take long for the hold lot in Bowling Green to become full. A location had to be picked that was secure, in close proximity and designed to accommodate a large number of vehicles, a rail head in Nashville was selected and secured to transfer the hold lot cars out to be reviewed, inspected and worked on as necessary. Some of the earliest cars built spent up to 8 weeks in the hold lot (either at the plant or at Nashville) until the production was released.
Lots of drama for the new owners, lots of rumor, speculation and stories.
Everyone is getting awfully worked up about the start of the '15's. This is no different than the start of any other model year with the exception that it isn't happening during the plants annual shutdown over the first two weeks of July. The first Corvettes produced during any model year launch are held while the validation process happens (captured test fleet vehicles are built ahead of production and driven during the hold period. This is designed to shake out any production or part issues prior to sending the cars to their new owners. Nothing for people to be alarmed about. This is not Nashville. This is good (and routine) automotive manufacturing practice to attempt to put the very best foot forward and produce an automobile of the quality that the new owner expects.
There was a tent down there where they were performing some sort of work.
Makes no sense to truck 1000 or so C7's down to Nashville for a QC, they could have just performed the QC at BG for the 2 weeks they were at BG waiting to goto Nashville.
My car, VIN 378, had a sticker on the windshield from some software company.
For the sake of the low VIN 15' owners, I hope it's not Nashville all over! That was painful!
There may be no qc problem but until engineering has a chance and time to so determine this is what we have, And we also have some assurance that the parts fit and the components work and a new Corvette delivered to a buyer will meet and hopefully exceed all expectations. Something we all should want.
Laborsmith



I figured something was up, because if no 2 week shutdown, then the next years production would of started bright & early Monday morning July 7th.
Lest face it; the continuance of the 2014 production was due to the A8 porgraming and the PDR not being completely ready for installation yet. They were simply buying time.
I figured something was up, because if no 2 week shutdown, then the next years production would of started bright & early Monday morning July 7th.
Lets face it; the continuance of the 2014 production was due to the A8 programing and the PDR not being completely ready for installation yet. They were simply buying time.
The Best of Corvette for Corvette Enthusiasts

why not start the 15's then on July 7th; more customers were waiting for the second-year C7 to be produced (the reasons - even if not warranted - were real on the minds of C7 buyers).
.
Last edited by Mike Mercury; Aug 22, 2014 at 10:15 PM.



With respect to the '14 production year, the '14's had a late start and there was a target quantity that needed to be produced to accomplish the goals that were established for the plant. There were also enough orders left on the books that it warranted completing the model run by finishing as many of those orders in the system as possible.
The 8 speed was intended to be launched on the Z06 only. It was finished EARLY which is why it was unveiled and released for the base car in '15.
The PDR was a 2014 package. 99% of it was done by mid model year. I drove a PDR car, in 2014, well ahead of the planned implementation. It was however, not good enough for track duty which it was planned. What changed was the implementation of the hardware that the manufacturer designed the PDR around. It is a racing telemetry package that was incorporated in to a production vehicle.
The 2015's have changes just like any other model year. There are suppliers making parts, just like any other model year. Even some of the parts that made the '14 will change going in the '15. Everyone thinks that the only thing that changed is the color orange and the 8 speed, again, they would be wrong. Things change. Things that were '14 parts that didn't make it, get introduced at the model year break. Things that suppliers need relief on get introduced at the model year break. There are calibration changes and refinements that need to be validated. These things happen in the CTF and they all need to be driven and approved. Until everything is signed off, no cars ship.
Last edited by talon90; Aug 22, 2014 at 10:21 PM.



GM's only obligation is to produce and ship the best car they can. The delay to '15 production was announced well before the end of the '14 run. That much was public. I've been involved in automotive manufacturing, sometimes a car not shipping is just that, there isn't always some underlying cover story to hide any facts. There was never anything that said that they would ship by any given date.
I'm going to guess that '15's will start shipping next week...and that is just my educated guess.
They didn't take a shutdown this year to close out the '14 model, that much was discussed somewhat publicly at the Bash in April. The shutdown period is used to PM and refurbish the equipment. The line had been down for 9 months in a total refit to launch the '14, no need to PM or refurbish brand new equipment. As a result however, there needs to be some time to validate the '15 builds. Like I said previously, things other than color have changed and they can't ship until they validate the process. Regardless of what I say, folk are going to believe what they want to believe. I'm ok with that. Not here to fight and certainly can't argue. Perception is reality to those perceiving.






GM's only obligation is to produce and ship the best car they can. The delay to '15 production was announced well before the end of the '14 run. That much was public. I've been involved in automotive manufacturing, sometimes a car not shipping is just that, there isn't always some underlying cover story to hide any facts. There was never anything that said that they would ship by any given date.
I'm going to guess that '15's will start shipping next week...and that is just my educated guess.
They didn't take a shutdown this year to close out the '14 model, that much was discussed somewhat publicly at the Bash in April. The shutdown period is used to PM and refurbish the equipment. The line had been down for 9 months in a total refit to launch the '14, no need to PM or refurbish brand new equipment. As a result however, there needs to be some time to validate the '15 builds. Like I said previously, things other than color have changed and they can't ship until they validate the process. Regardless of what I say, folk are going to believe what they want to believe. I'm ok with that. Not here to fight and certainly can't argue. Perception is reality to those perceiving.

You'd do well to heed what Paul has to say. He has a great deal of insight, sources, etc.