Constraints - December 11 for TPW of January 26/19 (Z06)
#1
Moderator
Thread Starter
Constraints - December 11 for TPW of January 26/19 (Z06)
RPO............Description.............. ..................Availability
Z51............Performance Package............................50%
C2Q............Dual Roof Package (Body Color and Transparent)..0%
C2Z............Visible Carbon Fiber Roof......................20%
C2M............Dual Roof Package (Visible CF and Transparent).20%
CFA............Standard roof (painted)........................40%
Z07............Z06 Performance package........................45%
CFV & Z07......Carbon Fiber Ground Effects and Z07 Perf Pkg ..No constraint listed
CFZ - Z07......Carbon Fiber Ground Effects minus Z07 Perf Pkg.25%
CFV............Carbon Fiber Ground Effects....................15%
M5U............8 Speed Auto Transimssion......................75%
Target Production Week of January 26, 2015 for non-Z06.
Target Production week of January 19, 2015 for Z06.
Z51............Performance Package............................50%
C2Q............Dual Roof Package (Body Color and Transparent)..0%
C2Z............Visible Carbon Fiber Roof......................20%
C2M............Dual Roof Package (Visible CF and Transparent).20%
CFA............Standard roof (painted)........................40%
Z07............Z06 Performance package........................45%
CFV & Z07......Carbon Fiber Ground Effects and Z07 Perf Pkg ..No constraint listed
CFZ - Z07......Carbon Fiber Ground Effects minus Z07 Perf Pkg.25%
CFV............Carbon Fiber Ground Effects....................15%
M5U............8 Speed Auto Transimssion......................75%
Target Production Week of January 26, 2015 for non-Z06.
Target Production week of January 19, 2015 for Z06.
#2
Drifting
Can you supply a quick synopsis regarding what these percentages mean?
The higher the percentage, lower the delay?
The lower the percentage, lower the delay?
Usually good with numbers, but sometimes, they drive me
The higher the percentage, lower the delay?
The lower the percentage, lower the delay?
Usually good with numbers, but sometimes, they drive me
#3
Moderator
Thread Starter
The % indicates the nationwide % of orders for this cycle that will be allowed to have the given option. So, for example the standard roof at 40% means that on a nationwide basis, only 40% of the allocations given to dealers will include the standard roof. The results for an individual dealer may vary substantially from this 40% figure. For example, they may get lucky and have their only allocation allow the painted roof (so, 100% for them). On the other hand, they might be unlucky and get no painted roofs out of 4 allocations (0% for them). It seems that the larger dealers tend to get a slightly higher percentage and smaller dealers tend to get a smaller percentage.
When dealers are given their allocations, they know exactly which allocations allow which constraint items.
When dealers are given their allocations, they know exactly which allocations allow which constraint items.
#4
Drifting
Its interesting that the Z51 is constrained at 50%and the Z06 is constrained to 45%. Is the demand for Z51 only a little higher than Z06?
Last edited by Ernest_T; 12-12-2014 at 04:21 PM.
#5
Moderator
Thread Starter
#6
Drifting
#8
Drifting
#9
Safety Car
Currently, the BGAP is trying to put out 7 Z06s per hour out of a target of 18 cars per hour, so about 39% of production. Apparently, this is the max they can make, given supply issues and Z06 demand, without totally screwing up Stingray production and screwing those customers.
As to the Z07, think of it as the "Z51" package for the Z06. More track stuff, stiffer suspension, more aero, and higher performance tires.
As to the Z07, think of it as the "Z51" package for the Z06. More track stuff, stiffer suspension, more aero, and higher performance tires.
Last edited by fdxpilot; 12-15-2014 at 12:41 PM.