Waiting on a Z51 2LT 7sp manual to be built. I know there is a constraint on the tranny now but ignoring that how long can I expect it to take? My dealer says he has an allocation for it. How long did yours take to be entered into the system (1101) or for the order to be accepted by Chevrolet (2000) after you placed your order? Total time from order to you actually receiving your car? Thank you.
2025 C2 of the Year ('64-'66) Finalist - Unmodified
2024 Corvette of the Year Finalist - Unmodified
2023 C2 of the Year Winner - Unmodified
2022 C8 of the Year Finalist - Unmodified
2022 C1 of the Year Finalist - Unmodified
2018 C1 of Year Finalist
2016 C1 of the Year Finalist
My '16 Z51 3LT A8 Vert was ordered on Feb 19th, Born on Mar 29th and delivered here in Nor Cal on April 14th. Just under 8 weeks. The dealership told me it was going to be more like 12 to 15 weeks.
My 2016 order was placed with GM on 6/6/15. On 8/22/15 i got the TPW of 9/14/15. On 9/17/15 i was told my car was built and waiting for a carrier to be assigned. And on 9/21/15 my dealer called me to tell me the truck was at the dealership and they are unloading it as we speak. I took it home on Fri 9/25/16.
Waiting on a Z51 2LT 7sp manual to be built. I know there is a constraint on the tranny now but ignoring that how long can I expect it to take? My dealer says he has an allocation for it. How long did yours take to be entered into the system (1101) or for the order to be accepted by Chevrolet (2000) after you placed your order? Total time from order to you actually receiving your car? Thank you.
Total time from order to drive home was a few days over 8 weeks.