January allocation from 3000 to 3300/3400.
The following 2 users liked this post by PFloyd1973:
ckrueger (03-01-2023),
_ThereIsNoSpoon_ (03-01-2023)
#222
Several of us on here with a C8 order went to status 3000 on January 24th and got the "order accepted" email from GM on January 25th.
I curious to when anyone from the January allocations moves to status 3300/3400 and/or receives a TPW. So far, I'm still at status 3000. I know it can take a few days to several weeks to move from status 3000.
This thread is my next step to pass the time while waiting for the build process to complete.
I curious to when anyone from the January allocations moves to status 3300/3400 and/or receives a TPW. So far, I'm still at status 3000. I know it can take a few days to several weeks to move from status 3000.
This thread is my next step to pass the time while waiting for the build process to complete.
#224
Le Mans Master
Member Since: Jul 2007
Location: Arkansas
Posts: 5,058
Received 1,397 Likes
on
803 Posts
St. Jude Donor '09-'10-'11-'12-'13-'14-'15-'16-'17,'22-'23
Do you have your order number? If so, Shane will look it up for you, doesn't have to be a Museum Delivery car. If you don't have it, that's not good.
#226
#227
My original TPW was 2/27 then after shutdown it went away with no TPW. Today I got the "next step" email and messaged the bot. They told me this morning by TPW is again 2/27/23? I hope it true.
#229
Instructor
#230
Advanced
#232
Racer
#233
Le Mans Master
Member Since: Mar 1999
Location: Fort Worth Texas
Posts: 9,566
Received 1,622 Likes
on
739 Posts
2024 Corvette of the Year Finalist - Unmodified
2023 C8 of the Year Winner - Unmodified
2020 Corvette of the Year Finalist (stock)
2019 C7 of Year Winner (stock)
Former Moderator
Cruise-In I-II-III Veteran
mine is 3LT, Z51, HTC, Front Lift, mag ride and Q9i wheels. 3000 on Jan 25th and will be built March 10th. I got very lucky as the wheels or any other combo of add-ons could have delayed me.
The following users liked this post:
BearZ06 (03-02-2023)
#234
Racer
now that’s fully loaded… what was your MSRP? Gotta be near or over 100k
#235
Intermediate
A long wait but will be worth it! I assume it is the wheels which have caused the delay but not certain.
Weather in SoCal sucks this year so will be ready for summer cruising!
Weather in SoCal sucks this year so will be ready for summer cruising!
The following users liked this post:
Bjenkins1962 (03-03-2023)
#236
Le Mans Master
Member Since: Mar 1999
Location: Fort Worth Texas
Posts: 9,566
Received 1,622 Likes
on
739 Posts
2024 Corvette of the Year Finalist - Unmodified
2023 C8 of the Year Winner - Unmodified
2020 Corvette of the Year Finalist (stock)
2019 C7 of Year Winner (stock)
Former Moderator
Cruise-In I-II-III Veteran
also added comp seats, sueded steering wheel, red stitching, carbon fiber interior, red seat belts, red calipers, stealth interior, black exhaust tips, and museum delivery! Can’t wait. I have GM OEM 5VM kit to install once I get home, as well as carbon fiber mirrors and grille.
#237
Instructor
#238
Drifting
Thread Starter
#239
Intermediate
Thanks! If I had known, I would have ordered the silver wheels as I am looking at Vossens eventually! I hope TPW will be sooner but still believe it will be an MY ‘23. If May, it will be 20 months since initial deposit.
#240
Drifting
I was in the TPW 2/27 club, until the dreaded shut down. Since then it pretty much has been a production news blackout.
Got an answer from Shane at the museum today, build date 3/14. I didn't know they gave out specific dates, but it sounds good to me.
Got an answer from Shane at the museum today, build date 3/14. I didn't know they gave out specific dates, but it sounds good to me.