So, if the TPW is accurate, you car will be built anywhere from 11/9 to 11/13 (but not 11/11 - Veteran's Day holiday at the plant). It could then ship within 2 to 14 days (+/-). A day or two to Ohio. So, anywhere from 11/12 to 12/1 +/-.
OP - Do you know the last five digits of your VIN? Here’s an edited version of C8J’s spreadsheet from <THIS> thread. The 8th and 9th column are the VIN ranges predicted to be built that day. First row is NOV 9, second row NOV 10, etc. Hope this helps.
There's no way to know that. It depends upon how the transporter with your car was loaded. For example, if the entire load is to one large forum dealer, it would be a couple of days. If there are 10 cars being delivered to 10 different dealers, it will be longer.
Designer Imagines A Corvette That Looks More Like a Corvette Than the Corvette
Slideshow: A Jaguar designer's personal project imagines what a modern front-engined Corvette might look like if Chevrolet revisited the golden age of the Stingray.