Roll Call - Oct. 25, 2023 Z06 3000 status
#121
Full size member
The following users liked this post:
lewislgZ06 (01-22-2024)
#122
Pro
#123
Instructor
#125
Full size member
my October 25th allocation just hit status 3400 this morning. I now have my VIN and the car supposed to be produced Next Friday
The following 2 users liked this post by 1 BAD ZR1:
KIKNBAK (02-03-2024),
lewislgZ06 (01-25-2024)
#126
Instructor
#127
Instructor
The following users liked this post:
Davedrives1 (01-25-2024)
#129
November 2019: Got on a Top 3 list.
October 25 2023: Order went to 3000
Initial TPW: 2/12
Change 1: 2/26
Change 2: 3/4
Red HTC, 3LZ. No Constraints. No carbon Fiber.
I've been on vacation since Jan. 15. I go back to work March 6. Wonderful...
Watching people whose orders went in a month later take delivery of their cars. Hope it doesn't blow an engine or seize the transmission the 1st week I have it. Whenever that will be.
October 25 2023: Order went to 3000
Initial TPW: 2/12
Change 1: 2/26
Change 2: 3/4
Red HTC, 3LZ. No Constraints. No carbon Fiber.
I've been on vacation since Jan. 15. I go back to work March 6. Wonderful...
Watching people whose orders went in a month later take delivery of their cars. Hope it doesn't blow an engine or seize the transmission the 1st week I have it. Whenever that will be.
#130
Racer
#131
Safety Car
Red Mist/Natural 3LZ HTC (non-Z06), front lift, stealth and Level 1 interior, black top/nacelles, black tips. Black wheels. No idea what might be holding it up, maybe just bad luck.
Last edited by CaryBob; 01-27-2024 at 10:05 PM.
#132
NCM Lifetime Member
Thread Starter
Member Since: Aug 2015
Location: Cunningham, TN
Posts: 4,996
Received 3,975 Likes
on
2,032 Posts
2021 Corvette of the Year - Modified
2020 C5 of the Year Winner- Modified
C5 of Year Finalist (appearance mods) 2019
St. Jude Donor '18-'19-'20-'21-'22-'23-'24
Went to 3400 today and got my VIN !!!
TPW got pushed out another week to 2/5.
I also got the second email from Chevrolet today.
TPW got pushed out another week to 2/5.
I also got the second email from Chevrolet today.
The following 3 users liked this post by lewislgZ06:
#133
Racer
The following users liked this post:
lewislgZ06 (01-27-2024)
#134
NCM Lifetime Member
Thread Starter
Member Since: Aug 2015
Location: Cunningham, TN
Posts: 4,996
Received 3,975 Likes
on
2,032 Posts
2021 Corvette of the Year - Modified
2020 C5 of the Year Winner- Modified
C5 of Year Finalist (appearance mods) 2019
St. Jude Donor '18-'19-'20-'21-'22-'23-'24
Hopefully the 10 hour shifts will get things caught up. The production numbers last week were pretty strong again, finally.
#135
Full size member
You and me both. I still have a TPW of 1/29, but my build date is 2/5, according to Shane. I got the same email notification from GM as well. And I got my VIN. #3425
The following 2 users liked this post by 1 BAD ZR1:
KIKNBAK (01-27-2024),
lewislgZ06 (01-27-2024)
#136
NCM Lifetime Member
Thread Starter
Member Since: Aug 2015
Location: Cunningham, TN
Posts: 4,996
Received 3,975 Likes
on
2,032 Posts
2021 Corvette of the Year - Modified
2020 C5 of the Year Winner- Modified
C5 of Year Finalist (appearance mods) 2019
St. Jude Donor '18-'19-'20-'21-'22-'23-'24
^^^^ VIN 3438 here.
The following users liked this post:
robertbruce (01-27-2024)
#137
Burning Brakes
October folks keep up the faith!
Looks like the October cars are starting to get slotted in now and move past 3000 status as my December allocation TPW went from 2/12 to now 2/26. I've seen a few Facebook and MECF updates where folks from October are now moving into 3300 and 3400 statuses and a few of you above have begun to move. With these longer shifts at the plant and increased production rates combined with better parts availability I think we'll see loads of movement this week and next.
Looks like the October cars are starting to get slotted in now and move past 3000 status as my December allocation TPW went from 2/12 to now 2/26. I've seen a few Facebook and MECF updates where folks from October are now moving into 3300 and 3400 statuses and a few of you above have begun to move. With these longer shifts at the plant and increased production rates combined with better parts availability I think we'll see loads of movement this week and next.
The following 2 users liked this post by CamsC8:
KIKNBAK (01-28-2024),
Shifterkartdrvr (01-28-2024)
#138
Instructor
My Z06 was built 1/26/24
This is a September 2023 allocation car and had a TPW of 1/22/24.
My 2024 Z06 timeline:
11/30/2020 - Got on a Z06 list, #7 at a midsized midwest dealer with a $1000 deposit
8/1/2022 - 1100 - Preliminary build of my Z06 on the GM Workbench
9/14/2023 - Got the call from the dealer that the guy ahead of me in line passed to wait for Z07 option, so I am up next. Did the final build on GM Workbench. Order accepted, no constraints
9/14/2023 - 2000 ORDER ACCEPTED BY GM
9/21/2023 - 3000 ORDER ACCEPTED BY PRODUCTION CONTROL
10/1/2023 - I went to Chevy's webpage and signed up for build notifications with my email, name and order #
10/4/2023 - Received email from GM saying my Z06 was accepted and "We'll send another email when your Corvette is on our production schedule."
10/5/2023 - Called Corvette Concierge, still at 3000, no TPW.
10/25/2023 - 3000, no TPW.
11/22/2023 - 3000, 63 days, no TPW
12/19/2023 - 3000 since 9/21/23, 90 days, no TPW.
1/12/2024 - Received an email from GM stating my September 2023 allocation Z06 was scheduled for production
1/12/2024 - 3300 ORDER SELECTED, SCHEDULED FOR PRODUCTION - TPW 1/22/24
1/26/2024 - 3800 ORDER PRODUCED, VIN IS AVAILABLE
This is a September 2023 allocation car and had a TPW of 1/22/24.
My 2024 Z06 timeline:
11/30/2020 - Got on a Z06 list, #7 at a midsized midwest dealer with a $1000 deposit
8/1/2022 - 1100 - Preliminary build of my Z06 on the GM Workbench
9/14/2023 - Got the call from the dealer that the guy ahead of me in line passed to wait for Z07 option, so I am up next. Did the final build on GM Workbench. Order accepted, no constraints
9/14/2023 - 2000 ORDER ACCEPTED BY GM
9/21/2023 - 3000 ORDER ACCEPTED BY PRODUCTION CONTROL
10/1/2023 - I went to Chevy's webpage and signed up for build notifications with my email, name and order #
10/4/2023 - Received email from GM saying my Z06 was accepted and "We'll send another email when your Corvette is on our production schedule."
10/5/2023 - Called Corvette Concierge, still at 3000, no TPW.
10/25/2023 - 3000, no TPW.
11/22/2023 - 3000, 63 days, no TPW
12/19/2023 - 3000 since 9/21/23, 90 days, no TPW.
1/12/2024 - Received an email from GM stating my September 2023 allocation Z06 was scheduled for production
1/12/2024 - 3300 ORDER SELECTED, SCHEDULED FOR PRODUCTION - TPW 1/22/24
1/26/2024 - 3800 ORDER PRODUCED, VIN IS AVAILABLE
The following users liked this post:
lewislgZ06 (01-30-2024)
#139
[QUOTE=Silamanajik;1607471185]My Z06 was built 1/26/24
This is a September 2023 allocation car and had a TPW of 1/22/24.
My 2024 Z06 timeline:
11/30/2020 - Got on a Z06 list, #7 at a midsized midwest dealer with a $1000 deposit
8/1/2022 - 1100 - Preliminary build of my Z06 on the GM Workbench
9/14/2023 - Got the call from the dealer that the guy ahead of me in line passed to wait for Z07 option, so I am up next. Did the final build on GM Workbench. Order accepted, no constraints
9/14/2023 - 2000 ORDER ACCEPTED BY GM
9/21/2023 - 3000 ORDER ACCEPTED BY PRODUCTION CONTROL
10/1/2023 - I went to Chevy's webpage and signed up for build notifications with my email, name and order #
10/4/2023 - Received email from GM saying my Z06 was accepted and "We'll send another email when your Corvette is on our production schedule."
10/5/2023 - Called Corvette Concierge, still at 3000, no TPW.
10/25/2023 - 3000, no TPW.
11/22/2023 - 3000, 63 days, no TPW
12/19/2023 - 3000 since 9/21/23, 90 days, no TPW.
1/12/2024 - Received an email from GM stating my September 2023 allocation Z06 was scheduled for production
1/12/2024 - 3300 ORDER SELECTED, SCHEDULED FOR PRODUCTION - TPW 1/22/24
1/26/2024 - 3800 ORDER PRODUCED, VIN IS AVAILABLE
[/QUOTE
That is great news after a long wait. Congratulations. I went 3000 mid September and stayed there until earlier this month then went to 3300 on 1/4 with TPW of 1/22. On 1/17 went to 3400 and from build info posted on the other forum my VIN was in the batch of builds that equated to the 1/26 build. Unfortunately no window sticker yet. Not sure if they ran out of part(s) or on QC hold. We have similar options, ground effects (though mine are painted) and Level 2 carbon fiber. Most of the cars built in the last 2 weeks were cars with ground effects or ground effects as part of an Aero Wing or Z07 option. Wondering if GM batches cars with these options together and that is why we sat at 3000 for so long. I look at C8Tracker daily and it has been several months since so many cars with these options were built and when they were they were in a couple of week build batch.
This is a September 2023 allocation car and had a TPW of 1/22/24.
My 2024 Z06 timeline:
11/30/2020 - Got on a Z06 list, #7 at a midsized midwest dealer with a $1000 deposit
8/1/2022 - 1100 - Preliminary build of my Z06 on the GM Workbench
9/14/2023 - Got the call from the dealer that the guy ahead of me in line passed to wait for Z07 option, so I am up next. Did the final build on GM Workbench. Order accepted, no constraints
9/14/2023 - 2000 ORDER ACCEPTED BY GM
9/21/2023 - 3000 ORDER ACCEPTED BY PRODUCTION CONTROL
10/1/2023 - I went to Chevy's webpage and signed up for build notifications with my email, name and order #
10/4/2023 - Received email from GM saying my Z06 was accepted and "We'll send another email when your Corvette is on our production schedule."
10/5/2023 - Called Corvette Concierge, still at 3000, no TPW.
10/25/2023 - 3000, no TPW.
11/22/2023 - 3000, 63 days, no TPW
12/19/2023 - 3000 since 9/21/23, 90 days, no TPW.
1/12/2024 - Received an email from GM stating my September 2023 allocation Z06 was scheduled for production
1/12/2024 - 3300 ORDER SELECTED, SCHEDULED FOR PRODUCTION - TPW 1/22/24
1/26/2024 - 3800 ORDER PRODUCED, VIN IS AVAILABLE
[/QUOTE
That is great news after a long wait. Congratulations. I went 3000 mid September and stayed there until earlier this month then went to 3300 on 1/4 with TPW of 1/22. On 1/17 went to 3400 and from build info posted on the other forum my VIN was in the batch of builds that equated to the 1/26 build. Unfortunately no window sticker yet. Not sure if they ran out of part(s) or on QC hold. We have similar options, ground effects (though mine are painted) and Level 2 carbon fiber. Most of the cars built in the last 2 weeks were cars with ground effects or ground effects as part of an Aero Wing or Z07 option. Wondering if GM batches cars with these options together and that is why we sat at 3000 for so long. I look at C8Tracker daily and it has been several months since so many cars with these options were built and when they were they were in a couple of week build batch.
The following users liked this post:
Silamanajik (01-28-2024)
#140
Racer
I checked with Shane and I’m still at 3000 with a TPW of 02/26.