hud swap
you will not need to swap cluster, just the 11 pin wire harness which goes to the hud switch to the back of the cluster, along w/ the hud switch and the dash pads
it takes about 30-40 minutes to remove the cluster, dash pad and all the required bits
if you are in the CT area i can help out w/ the upgrade
a pic of the aft hud proj. mount(it's already there)--the 'u'

this is the forward left mount tab on the hud which needs to be drilled

i think you could do the entire swap from the 2000 to 2002 in < 3 hours, the only difficult task would be mounting/drilling the 2 holes for the forward hud mounting tabs
Last edited by SteveDoten; Jan 3, 2006 at 09:33 AM.









w/ him......Good luck
