Just ordered 2018-Z when should allocation change to 2000?
#42
#44
TPW OF 7/17/17.
Time to hurry up and wait.
Time to hurry up and wait.
#45
Burning Brakes
Thread Starter
#46
#47
New Status today.
Placed order on 6/6 for Museum Delivery 2018 Z06 3LZ
6/7 - Status 3000 - Accepted by Production Control
6/19 - Status 3001 - TPW assigned as 7/3/17
6/23 - Status 3300 - Order Scheduled for Production
Placed order on 6/6 for Museum Delivery 2018 Z06 3LZ
6/7 - Status 3000 - Accepted by Production Control
6/19 - Status 3001 - TPW assigned as 7/3/17
6/23 - Status 3300 - Order Scheduled for Production
#48
#49
Placed order on 6/6 for Museum Delivery 2018 Z06 3LZ
6/7 - Status 3000 - Accepted by Production Control
6/19 - Status 3001 - TPW assigned as 7/3/17
6/23 - Status 3300 - Order Scheduled for Production
Update
6/23 - got an email from the museum. Car will be finished 7/3. Typically 2 weeks after that is the first available delivery date.
6/7 - Status 3000 - Accepted by Production Control
6/19 - Status 3001 - TPW assigned as 7/3/17
6/23 - Status 3300 - Order Scheduled for Production
Update
6/23 - got an email from the museum. Car will be finished 7/3. Typically 2 weeks after that is the first available delivery date.
#51
Le Mans Master
Just use the chevy chat on there site.
http://www.chevrolet.com/contact/chat
enter your name and phone and in the drop down enter check my order status, then just ask what your order status code is, and give them your order # and state of dealer. they were very nice and gave me the code right away.
http://www.chevrolet.com/contact/chat
enter your name and phone and in the drop down enter check my order status, then just ask what your order status code is, and give them your order # and state of dealer. they were very nice and gave me the code right away.
#52
Le Mans Master
#54
Update 6/26
Placed order on 6/6 for Museum Delivery 2018 Z06 3LZ
6/7 - Status 3000 - Accepted by Production Control
6/19 - Status 3001 - TPW assigned as 7/3/17
6/23 - Status 3300 - Order Scheduled for Production
Update
6/23 - got an email from the museum. Car will be finished 7/3. Typically 2 weeks after that is the first available delivery date.
Update
6/26 - Status changed to 3400 - Broadcast - Parts are being pulled for your car prior to start of production
6/7 - Status 3000 - Accepted by Production Control
6/19 - Status 3001 - TPW assigned as 7/3/17
6/23 - Status 3300 - Order Scheduled for Production
Update
6/23 - got an email from the museum. Car will be finished 7/3. Typically 2 weeks after that is the first available delivery date.
Update
6/26 - Status changed to 3400 - Broadcast - Parts are being pulled for your car prior to start of production
#56
I'm at 3300. Makes sense since I'm a week behind.
#57
Melting Slicks
That's cool to see these later orders getting built. I was almost with you guys until I decided to get on that the dealer already had in the system.
#58
Burning Brakes
Thread Starter
#59
Melting Slicks
Mine was built 6/14. Picking it up Monday.
When I talked to MacMulkin on 6/12 I was going to order for Museum delivery, but opted for one that had already been ordered since it matched my order.
When I talked to MacMulkin on 6/12 I was going to order for Museum delivery, but opted for one that had already been ordered since it matched my order.
#60