When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
The dealer told me the VIN today.
Going by a production schedule on the other C8 forum, that translates into being built 9 April.
The 19th Stingray of the day.
Ouch!
I guess I have been luckier than that, Jag & SOS. Have no idea what the difference would be. If you were at 2000 & 3000 you had no constraints. ???
This is for a 3LT Stingray:
Deposit at MacMulkin on Th 1/29 (1000)
Allocation & accepted at GM F 2/13 (2000)
Accepted by Production Control W 2/18 (3000)
Scheduled for Production Th 3/5 (3300)
Internal Plant Broadcast F 3/20 (3400)
Production/Assembly - based on VIN - tomorrow - Th 3/26 (3800)!!!!
I have never gotten the welcome email from Chevrolet.
I was never told a TPW (Tentative Production Week), but the Museum did mention a probable production day of 3/26 back on 3/5 - I am doing an R8C delivery. It looks like I made it for a hand-off the day before the Bash, which was my plan in January.
Built last Thursday, 3/26, mid-shift as anticipated. (3800)
Racing stripes applied.
Bayed in storage lot for a few days/over the weekend. (4B00)
Trucked over to the NCM today, T 3/31 (4200 & 5000)
R8C delivery confirmed for a day before the Michelin Bash W 4/22!!!
Trucked over to the NCM today, T 3/31 (4200 & 5000)
R8C delivery confirmed for a day before the Michelin Bash W 4/22!!!
Just curious..
Is it typical for cars to be held at the NCM for that long (3 weeks)?
You'd think they either don't have the room or want the responsibility for it in case of damage.
Just curious..
Is it typical for cars to be held at the NCM for that long (3 weeks)?
You'd think they either don't have the room or want the responsibility for it in case of damage.
Looks like they have a less glamorous holding area outside of the museum. I'd imagine they have to have some flexibility for travel and special events like Bash.
Thanks for the photo.
Is the lot in the left background also for NCM storage?
I'm surprised by the fencing, in my state it would have to be 10' and topped with razor wire and even then...