When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
I would agree with you guess. Most of our July allocations are 9/13 week; only 2-3 in 9/20 & 9/27 weeks. So you guys could be in 9/20; 9/27 and 1st week in October.
I thought there were a couple who reported TPW's of 9/6? Maybe they were mistaken?
I would agree with you guess. Most of our July allocations are 9/13 week; only 2-3 in 9/20 & 9/27 weeks. So you guys could be in 9/20; 9/27 and 1st week in October.
I thought there were a couple who reported TPW's of 9/6? Maybe they were mistaken?
Nobody on the "July Allocations (Tracking) spreadsheet that I know about; unless I missed someone inputing that date.
On another note, I have been chatting with a couple of CF members here that were contacted by Shane at NCM regarding their specific production date and scheduling of their NCM delivery (which is always at least 2 weeks out from production date). My point is that those contacts were 9 days and 13 days prior to their specific production date. SO, 13 days prior for those participating on this 'thread' & that have 9/13 week TPW would be early September; with 3300 & 3400 coming some amount of days before that even.
Another SUMMARY: out of 13 responders (all are IN now), we have 10 with TPWs of 9/13; 1 at 9/20 and 2 at 9/27.
Can not even guess why the majority are at 9/13 and then there are 3 outside that date at 9/20 & 9/27??
There are 2 HG colors both at 9/27 (new colors have previously before been scheduled later) but we have 1 HG at 9/13 also.
The 2 HG at 9/27; 1 is 1LT & 1 is 3LT. The 9/13 HG is a 2LT and maybe that makes it move up in the production sequence. Your guess is probably better than mine.
Another SUMMARY: out of 13 responders (all are IN now), we have 10 with TPWs of 9/13; 1 at 9/20 and 2 at 9/27.
Can not even guess why the majority are at 9/13 and then there are 3 outside that date at 9/20 & 9/27??
There are 2 HG colors both at 9/27 (new colors have previously before been scheduled later) but we have 1 HG at 9/13 also.
The 2 HG at 9/27; 1 is 1LT & 1 is 3LT. The 9/13 HG is a 2LT and maybe that makes it move up in the production sequence. Your guess is probably better than mine.
I would want to see the exact build of the 9/27 TPW cars. Maybe there is some other option they have in common that has delayed production. It could also be a limitation on HTC as 50% (of a small sample) are being built the week of 9/27. But 100% of the 9/27's are HTC. Perhaps compare the exact build of all the HTC's to see if something stands out.
Or, IF they (9/27) were really interested they could just follow up with Shane and 1) see if they are moving up in dates or 2) why they are 2 weeks behind the 9/13 bunch. Shane seems to have great insights. BIGGER question: Is there a chance that those or some of those 9/13 could move up into 9/6 week which some have suggested as it seems like the final 2021 MY cars are rolling along through production very nicely.
I talked to Shane Monday and was told that I’m still at 9/27 but subject to change. He didn’t specify if that meant earlier or later😁. Loaded 3LT with a MSRP OF OVER 94k. Only thing I wanted that is not available from factory during build is the CF ground effects package. Dealer tried but apparently only available now with the C8R build.
I talked to Shane Monday and was told that I’m still at 9/27 but subject to change. He didn’t specify if that meant earlier or later😁. Loaded 3LT with a MSRP OF OVER 94k. Only thing I wanted that is not available from factory during build is the CF ground effects package. Dealer tried but apparently only available now with the C8R build.
My dealer is telling me they will handle getting the GM ground effects option to the NCM for them to install during PDI. Only time will tell if that truly works out.
I am sending grill screens to Shane at the NCM for them to install. Probably also PPF at Auto Armour too. I will be at NCM for 2-3 days.
I would want to see the exact build of the 9/27 TPW cars. Maybe there is some other option they have in common that has delayed production. It could also be a limitation on HTC as 50% (of a small sample) are being built the week of 9/27. But 100% of the 9/27's are HTC. Perhaps compare the exact build of all the HTC's to see if something stands out.
My 1LT HG is a HTC with Z51, Mag ride, Comp seats/sueded steering wheel, edge red calipers, carbon flash roof/nacelles/mirrors/spoiler, and museum delivery.
I will update when I move from event 3000 as it currently stands with a tentative TPW of 9/27/2021.
I talked to Shane Monday and was told that I’m still at 9/27 but subject to change. He didn’t specify if that meant earlier or later😁. Loaded 3LT with a MSRP OF OVER 94k. Only thing I wanted that is not available from factory during build is the CF ground effects package. Dealer tried but apparently only available now with the C8R build.
Did you also get the Comp seats/sueded steering wheel?
From everything I read so far we won’t be getting to the next level according to Chevy till around a week or two before our production week. That doesn’t mean we won’t be there sooner it’s just that Chevy doesn’t want to release that info too early. Just knowing our TPW through Shane is pretty awesome.
I asked Shane. I was trying to ask Lori to try to take the weight off of His shoulders but she has an auto reply set up. If you are lurking here Shane, thanks for dealing with us.
until next Friday…
Originally Posted by EasyMoney$$
Did you do your update with Shane at the NCM or your dealer. MM has not update their '22 order tracking web page with any TPWs yet.
I'm hoping some of us get moved up to 9/6 TPW week! It is interesting to see the "count down" on '21MY builds.
Thank you for this thread, happy to become part of it:
- State: GA
- Dealer: RHD
- Coupe
- Torch Red with Adrenaline Red two tone seats
- 2LT - Z51 with Magnetic Selective Ride Control
- Front Lift memory
Deposit: 04/24/2021
Preliminary Order (1100): 07/24 Accepted by GM (2000): 08/03 <-- I think this date is wrong from the Corvette Concierge lady or I heard her wrong
Accepted by Production (3000): 08/03
Current status: Available to Sequence (3100): 08/18, awaiting on 3400: ??? TPW: 09/06 (emailed Shane yesterday 08/19)
Thank you for this thread, happy to become part of it:
- State: GA
- Dealer: RHD
- Coupe
- Torch Red with Adrenaline Red two tone seats
- 2LT - Z51 with Magnetic Selective Ride Control
- Front Lift memory
Deposit: 04/24/2021
Preliminary Order (1100): 07/24 Accepted by GM (2000): 08/03 <-- I think this date is wrong from the Corvette Concierge lady or I heard her wrong
Accepted by Production (3000): 08/03
Current status: Available to Sequence (3100): 08/18, awaiting on 3400: ??? TPW: 09/06 (emailed Shane yesterday 08/19)
Glad to have you as part of the thread! Your TPW is the first 9/6 that anyone's reported on the forum. I'd say that pretty well cements GM's plans. Congratulations, you're going to have a very early MY2022...
Glad to have you as part of the thread! Your TPW is the first 9/6 that anyone's reported on the forum. I'd say that pretty well cements GM's plans. Congratulations, you're going to have a very early MY2022...
Thank you very much Bob, very exciting times for me. I appreciate the welcoming and I'm eager to report more good news to this group in the near future. I feel somewhat undeserving of such honor of having a very early MY2022 TPW since I know they are hundreds if not thousands of people awaiting for a long time for their own turn at a moment like this. Thanks.
Designer Imagines A Corvette That Looks More Like a Corvette Than the Corvette
Slideshow: A Jaguar designer's personal project imagines what a modern front-engined Corvette might look like if Chevrolet revisited the golden age of the Stingray.