LG Motorsports -we are in our new facility
#1
Premium Supporting Vendor
Thread Starter
Member Since: Oct 2001
Location: Dallas Tx
Posts: 8,392
Received 571 Likes
on
292 Posts
St. Jude Vendor Donor '03-'04-'05-'06-'07-'08-'09-'10-'11
LG Motorsports -we are in our new facility
Update, we have moved in!
704 E Houston st
Anna Tx (Actually, Westminster in google. )
Stop,out to see us. Install shop is running full tilt.
55,000 sf total.
Thanks
Lou Gigliotti
972-429-1963
704 E Houston st
Anna Tx (Actually, Westminster in google. )
Stop,out to see us. Install shop is running full tilt.
55,000 sf total.
Thanks
Lou Gigliotti
972-429-1963
#5
Team Owner
Good looking shop, congrats.
The following users liked this post:
LG Motorsports (05-23-2017)
The following users liked this post:
LG Motorsports (05-27-2017)
The following users liked this post:
LG Motorsports (05-27-2017)
#11
Team Owner
Member Since: Mar 2004
Location: Oklahoma City OK
Posts: 58,259
Received 1,675 Likes
on
1,298 Posts
C6 of Year Finalist (appearance mods) 2019
Congrats!
The following users liked this post:
LG Motorsports (05-27-2017)
The following users liked this post:
LG Motorsports (05-27-2017)
#15
Premium Supporting Vendor
Thread Starter
Member Since: Oct 2001
Location: Dallas Tx
Posts: 8,392
Received 571 Likes
on
292 Posts
St. Jude Vendor Donor '03-'04-'05-'06-'07-'08-'09-'10-'11
Right in the way of the new future Dallas Metroplex Expansion.
See you there when you come up.
Thanks
Lou Gigliotti
#16
Premium Supporting Vendor
Thread Starter
Member Since: Oct 2001
Location: Dallas Tx
Posts: 8,392
Received 571 Likes
on
292 Posts
St. Jude Vendor Donor '03-'04-'05-'06-'07-'08-'09-'10-'11
We used an epoxy that was made for Aircraft hangers. It had a 2 part primer coat then the final epoxy top coat.
The painters are still sanding and painting so it is pretty dusty at the moment but hopefully that will end soon
It was a lot of work but it was worth it.
Lou G
The painters are still sanding and painting so it is pretty dusty at the moment but hopefully that will end soon
It was a lot of work but it was worth it.
Lou G
#18
Premium Supporting Vendor
Thread Starter
Member Since: Oct 2001
Location: Dallas Tx
Posts: 8,392
Received 571 Likes
on
292 Posts
St. Jude Vendor Donor '03-'04-'05-'06-'07-'08-'09-'10-'11
yes, new layout. And we had to overcome the attempt by the City to "annex" my property. Which we did. So we continue to be in the Unincorporated area with no road blocks.
We have to go through the county now which is not an issue.
So we are starting to finally move forward. Redesigned track layout, Garage space available for lease as we speak.
Thanks
Lou Gigliotti
3.4 mile total length, North and South tracks around 1.7 each.
Building #2 with 20,400 sf for lease. 8 spaces @ 2500sf or any combination up to 20,400 sf
We have to go through the county now which is not an issue.
So we are starting to finally move forward. Redesigned track layout, Garage space available for lease as we speak.
Thanks
Lou Gigliotti
3.4 mile total length, North and South tracks around 1.7 each.
Building #2 with 20,400 sf for lease. 8 spaces @ 2500sf or any combination up to 20,400 sf