where corvettes ever built in canada?
#2
Team Owner
Member Since: Jun 2000
Location: Southbound
Posts: 38,928
Likes: 0
Received 1,469 Likes
on
1,248 Posts
Cruise-In II Veteran
The seller is mistaken. The 53s were assembled at Flint, Michigan.
54-81 were assembled at St. Louis, Missouri.
81 to the present, Corvettes have been assembled at Bowling Green, Kentucky.
With the exception of possibly 1953, Corvettes have been exported to Canada.
54-81 were assembled at St. Louis, Missouri.
81 to the present, Corvettes have been assembled at Bowling Green, Kentucky.
With the exception of possibly 1953, Corvettes have been exported to Canada.
Last edited by Easy Mike; 01-17-2018 at 02:37 PM.
#4
Team Owner
No never.
#6
Safety Car
There is probably a Canadian certification label in the drivers door if it was exported here but it wasn't made here.
#7
Melting Slicks
NOT ST. Louis, but Ferguson, MO. (where they had the riots last year) actually. Very close to St. Louis.
Last edited by lvmyvt76; 01-17-2018 at 08:08 PM.
#8
Did they built Corvette motors at the GM St. Catharines plant at one point?
Seems to me I was there when they started them on propane for the first time.
Seems to me I was there when they started them on propane for the first time.
#9
Team Owner
Member Since: Feb 2003
Location: Sitting in his Nowhere land Hanover Pa
Posts: 49,014
Received 6,945 Likes
on
4,784 Posts
2015 C2 of Year Finalist
#11
Team Owner
Member Since: Jun 2000
Location: Southbound
Posts: 38,928
Likes: 0
Received 1,469 Likes
on
1,248 Posts
Cruise-In II Veteran
#12
Racer
#14
Team Owner
Member Since: Jun 2000
Location: Southbound
Posts: 38,928
Likes: 0
Received 1,469 Likes
on
1,248 Posts
Cruise-In II Veteran
#15
Team Owner
Member Since: Sep 2006
Location: Westminster Maryland
Posts: 30,173
Likes: 0
Received 2,878 Likes
on
2,515 Posts
Hi,
The Flint Engine plant assembly process was quite an operation.
There were 2 lines running simultaneously.
They produced about 5000 engines per day.
Some days engines were assembled in as many as 100 configurations.
The painting of each engine was accomplished in about 13 seconds.
The engines headed to St.Louis for Corvettes were shipped in rail cars. But, because the rail car held more than the number of engines required at St.Louis each day, the rail car was held in Flint until it was 'full'... typically about 2 days.
The number of parts the machining part of the Flint plant processed each day make the engine assembly numbers look like a drop in the bucket. It ran 3 shifts and required 2 thirds of the plant's space.
Regards,
Alan
From John Hinkley (John Z).
http://www.camaros.org/pdf/flint_engine.pdf
The Flint Engine plant assembly process was quite an operation.
There were 2 lines running simultaneously.
They produced about 5000 engines per day.
Some days engines were assembled in as many as 100 configurations.
The painting of each engine was accomplished in about 13 seconds.
The engines headed to St.Louis for Corvettes were shipped in rail cars. But, because the rail car held more than the number of engines required at St.Louis each day, the rail car was held in Flint until it was 'full'... typically about 2 days.
The number of parts the machining part of the Flint plant processed each day make the engine assembly numbers look like a drop in the bucket. It ran 3 shifts and required 2 thirds of the plant's space.
Regards,
Alan
From John Hinkley (John Z).
http://www.camaros.org/pdf/flint_engine.pdf