Motor is in!!!!!!!!!!!!!!!!!!!!!!!!!!!!
I had already bought new Gymkhana suspension pieces. So I decided to finish upgrading the suspension with KYB Shocks, poly bushings everywhere (the only ones I haven't done are the body mounts), smart struts, the heavy duty tie rod sleeves from VBP, rebuilt steering box, and performance friction semi metallic pads.
All that and I hadn't even got to the motor. It is a 355ci with 9.5:1 federal mogul hyper pistons, mildly ported Vortec heads with 7/16" screw in studs, 1.379" double springs with AL retainers, and 1.6 RRs. XE268H-14 (TPI version) 224/230 @.050" .510"/.512 lift, SDPC Vortec tpi base, ported SLP Runners, ported plenum, 52 MM TB (done by David Koldos), 1 5/8" headers wrapped with thermo tec exhaust wrap, and car chemistry collector inserts, and a griffen AL radiator and dual electric fans. If I can get everything hooked up and route my cold air induction in front of the radiator (like patsnitrovette) I should have it all together and fired up in about two weeks time permitting of coarse. Sorry to ramble but it is pretty exciting for me to get it all back together after not even being able to see her for a year.
[Modified by mean8t, 3:12 PM 5/8/2003]
Josh
[Modified by Fevre, 2:42 PM 5/8/2003]






The Best of Corvette for Corvette Enthusiasts









